Earthdome Loft Engineering Header, earthbag construction header, earth bag engineering

Earth-Dome Loft Structural Engineering, Design and Calculations

This page shares the earth-dome loft structural engineering calculations. We discuss this with the following sections:

THIS PAGE IS THE ORIGINAL CALCULATIONS AND DESIGN. PLEASE VISIT THE NEW PAGE FOR THE UPDATED AND CURRENT DESIGNS AND CALCULATIONS.

 

NOTE: THIS PAGE IS NOT CONSIDERED BY US TO BE A COMPLETE AND USABLE TUTORIAL UNTIL
WE HAVE OUR PLANS PERMITTED AS PART OF THE CONSTRUCTION OF THE EARTHBAG VILLAGE.
AT THAT TIME WE WILL ADD HERE THOSE PERMITTED PLANS AND ANYTHING ELSE WE LEARNED
.

IN THE MEANTIME, WE WELCOME YOUR INPUT AND FEEDBACK

 

RELATED PAGES (click icons for complete pages)

Highest Good housing, cob construction, earthbag construction, straw bale construction, earthship construction, subterranean construction, sustainable homes, eco-homessustainable civilization building though housing, sustainable housing, best practice living, sustainable housing systems, green materials, earthbag, cob, straw bale, One Community, open source housing, free-shared architecture, sustainable living, green living, eco living, living ecologically, for The Highest Good of All, transforming the world, build your own home, build your own house, affordable housing, open source architecture, architects of the future, sustainability non-profit, 501c3 organization, sustainable life, water catchment, organic food, eco-housing, artistic homes, sustainability cooperative, sustainable living group, open source, sustainability nonprofit, free-shared plans, teacher/demonstration village, open source project-launch blueprinting, One Community housing, Highest Good housingopen source equipment, sourcing equipment, what equipment you need, eco-equipment selection, Highest Good equipment, tools and equipment, earthbag tools and equipment, straw bale tools and equipment, cob tools and equipment, earth block tools and equipment, green tools and equipment, earthship tools and equipmentbuilding time needs, time investment, build times, time to build, earthbag build time investment, straw bale build times, eco build times, sustainable build times, green building, labour evaluation, labour investment, labour input, labor requirements, labor input, time for buildingOne Community furniture, dome home furniture, round furnitureengineering icon, structural engineering, column engineering, beam engineering, footer engineering, floor engineering, mechanical engineering, civil engineering, structural engineering, cob engineering, straw bale engineering, shipping container engineering, City Center engineering, earthbag engineering, eco-engineering, open source engineering, One Community engineering, green living engineering, sustainable community engineering, recycled materials engineering, compressed earth block engineering, tree house engineering, One Communitysustainable food, best practice food, sustainable food systems, aquaponics, walipini, aquapini, zen aquapini, One Community, open source food, free-shared architecture, sustainable living, green living, eco living, living ecologically, for The Highest Good of All, transforming the world, grow your own food, build your own greenhouse in the ground, ground greenhouse, open source architecture, architects of the future, sustainability non-profit, 501c3 organization, sustainable life, water catchment, organic food, food anywhere, maximum food diversity, build your own farmers market, sustainability cooperative, sustainable living group, open source, sustainability nonprofit, free-shared plans, teacher/demonstration village, open source project-launch blueprinting, One Community Updatetransforming the global environment, transformational change, evolving living, One Community, One Community Global, creating a new world, the solution to everything, the solution to everything, the solution to anything, creating world change, open source future, for The Highest Good of All, a world that works for everyone, world change, transforming the planet, difference makers, sustainability non-profit, solution based thinking, being the change we want to see in the world, making a difference, sustainable planet, global cooperative, 501c3 sustainability, creating our future, architects of the future, engineers of the future, sustainable civilization, a new civilization, a new way to live, ecological world, people working together, Highest Good food, Highest Good energy, Highest Good housing, Highest Good education, Highest Good society

WAYS TO CONTRIBUTE TO EVOLVING THIS SUSTAINABILITY COMPONENT WITH US

SUGGESTIONS     ●     CONSULTING     ●     MEMBERSHIP     ●     OTHER OPTIONS

 

CLICK THESE ICONS TO JOIN US THROUGH SOCIAL MEDIA

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

KEY CONSULTANTS FOR THE EARTH-DOME LOFT

Antonio Zambianco: Civil Engineering Student
Hannah Copeman: Structural Engineer
Philip Gill: Interior and Furniture Designer and Owner of Philip Gill Design

 

WHAT IS EARTH DOME LOFT ENGINEERING

earthdome loft engineering, engineered loft, earthbag home. earthbag engineering, structural engineering, sustainable engineering, open source engineering, green living, dome home engineering, earthbag village, Pod 1 engineering, One Community engineering, One Community Global engineeringEarth dome loft engineering covers the calculations necessary for safe construction and use of the loft storage area for the Earthbag Village living structures.

 

WHY OPEN SOURCE EARTH DOME LOFT ENGINEERING

earthdome loft engineering, engineered loft, earthbag home. earthbag engineering, structural engineering, sustainable engineering, open source engineering, green living, dome home engineering, earthbag village, Pod 1 engineering, One Community engineering, One Community Global engineeringOpen sourcing our earthbag engineering research is important so that it can be replicated and/or so other engineers/designers can build-upon our work to improve it and/or make changes to suit their own projects/visions. This is especially important for these loft details because the Earthbag Village is designed with only one size and design for the dome. Modification of the dome size or design will require new engineering calculations if maximum loft safety is to be maintained.

 

EARTHBAG LOFT CONSTRUCTION
ENGINEERING DETAILS

 In this work, four different options for design of the earth-dome loft storage are analyzed. They are:

  • 2×8 joists, spaced 24 inches from each other
  • 2×10 joists spaced 24 inches from each other
  • 2×8 joists, spaced 16 inches from each other
  • 2×10 joists spaced 16 inches from each other

We analyze these with the following sections:

 

EARTH DOME LOFT LOADS

The combination of loads chosen to check the loading capacity of this loft was (L+D), where “L” is the live load (whose maximum value we are looking for) and “D” is the dead load (whose components are both the weight of the plywood layer, “D1”, and the weight of the own joists, “D2”).

  • D2 will act only on the superior part of the joists, which means that D2 times the cross area of the joist will give us the linear load (lb/ft) corresponding to D2. Considering Douglas Fir-Larch (north, No. 2 or better), whose average density in lb/ft3 is 32, will be used in this project, this number is 2.418 lb/ft for 2×8’s and 3,083 lb/ft for 2×10’s
  • Both L and D1 will act on the areas inside the interior walls. Then, they need to be distributed to each joist according to their influence areas. How those areas were divided is shown in the figures below:

figure-1

For example, if we go with joists 24″ O.C., in order to see which fraction of the load W = (D1 + L) will act on the joist 1 (the first red line, from left to right), three different loads were considered. That’s the part of this joist that will be in between interior walls (i.e., that will receive this load W): the others (the dark blue lines, 1.9 ft each, will receive just the load D2.

Figure 2: Converting W to linear load for Joist 1, 24

The first one is the green rectangle at its right and, linearly (lb/ft), it will be W times its width (in this case, 1 ft) and will act on the entire length of the joist inside the interior walls.

Figure 3: Joist 1 - First Load.

The second one is the bigger blue triangle. This will be converted to a triangular load, whose maximum value (that happens at mid-span) will be W times the distance between the joist and the extreme point of the triangle (1.8 ft). At the ends of the joist, this load will be zero.

Figure 4: Joist 1 - Second Load.

The last load to be considered is the small triangle, just above the red rectangle. This load, at a 2D analysis, will be a triangular one starting with W times its base (1 ft) and ending with zero at a distance equals its high (also 1 ft).

Figure 5: Joist 1 - Third Load.

Finally, by adding those three loads we can find the total action by W over the joist 1 (CASE 1), as shown in the figure below, where all the numbers are multiplied by 100 in order to better visualize the results.

Figure 6: Joist 1 - Complete CASE 1

We still need to consider the action of the load D2 (CASE 2):

fig-7-large-640

 

EARTH DOME LOFT DESIGN VALUES

Stresses
Tabulated design values by using NDS-S (Tables 4A and 1B)

Fb = 850 psi
Fv = 180 psi
Fc⊥ = 625 psi
Fc = 1400 psi
E = 1,600,000 psi

Coefficients
Lumber property adjustments and adjusted design values (NDS•2.3)

CD = 1.0 CL = 1.0
Cr = 1.15 Cb = 1.0
CF = 1.2 CP = 1.0
CH = 2.0

Corrected Stresses

Fb’= FbCrCFCDCL = 1,173 psi Fv’= FvCHCD = 360 psi
Fc⊥’= Fc⊥Cb = 625 psi
Fc’= FcCFCDCP = 1680 psi
E’ = E = 1,600,000 psi

Geometric Parameters

(2×8’s) (2×10’s)
Ixx = 47.63 in4 Ixx = 98.93 in4
Sxx = 13.14 in3 Sxx = 21.39 in3
b = 1.5 in b = 1.5 in
d = 7.25 in d = 9.25 in
A = 10.88 in2 A = 13.88 in2

 

EARTH DOME LOFT SUPPORTS

  • Points in contact with the Murphy Bed Wall were considered as rolling
  • The reaction due to the part where the beams are partially supported was considered concentrate (rolling), and its application point (measuring starting at the edge support) was chosen the less between half of the supported length and half of the high of the joists

RUNNING CALCULATIONS

24″ O.C.

(2×8 Option)

Joist 1-CASE 1 (L+D1)

Figure 8: Joist 1 under CASE 1 of load (a); shear diagram (b); moment diagram (c); deformed shape (d). NOTE: all the numbers are multiplied by 100/W.

Fig 9

Joist 1 RESULTS (CASE 1 + CASE 2)

Joist 1 Case 1 and Case 2

  • WMAX based on bending capacity:

wmax bending

  • WMAX based on shear capacity:

wmax shear

  • WMAX based on bearing capacity:

wmax bearing

  • WMAX based on maximum deflection:

wmax deflection

Other Joists

Figure 10 - Click to Enlarge

Figure 11

Figure 12

Figure 13

Figure 14

The table below summarizes the results found for 24″ O.C. Notice that increasing the cross-section from 2×8 to 2×10 we increase the load capacity from 69.64 to 73.61 lb/ft².

Table 1

Figure 15

figure 16

figure 17

figure 18

figure 19

figure 20

figure 21

Figure 22

figure 23

The table below summarizes the results found for 16″O.C. Notice that increasing the cross-section from 2×8 to 2×10 we increase the load capacity from 72.64 to 80.47 lb/ft².

table 2

 

RESOURCES

None yet.

 

CONCLUSIONS AND COMMENTS

Here are the results of our analysis.

 

SPACE BETWEEN BLOCKINGS

L-640

Where “b” is the width of the joists, “fc” is the design stress caused by compression parallel to the grains and “k” is given by the following table and depends on the relation between the high and the width of the joists:

table 3

 

CONDITIONS TO CONSIDER PIN CONNECTIONS IN THE JOIST

In order to satisfy the model assumed in this work, the joists should be prevented from moving both vertically and horizontally at an average distance of 0.3 ft = 4 in from the interior walls (as shown in the figure below).

x-640

DIMENSIONS IN THE CASE 16″ ON CENTER

figure25-640

high-res

Final Load Capacity

Considering the plywood to be used has 2.13 lb/ft², the final load capacity (only live load) to each option of design is:

  • 69.64 – 2.13 = 67.5 lb/ft² for 2×8 joists, spaced 24 inches
  • 73.61 – 2.13 = 71.5 lb/ft² for 2×10 joists, spaced 24 inches (6% higher)
  • 72.64 – 2.13 = 70.5 lb/ft² for 2×8 joists, spaced 16 inches
  • 80.47 – 2.13 = 78.3 lb/ft² for 2×10 joists, spaced 16 inches (11% higher)

 

EARTH DOME LOFT PLYWOOD LAYER

It is important to note that calculations were made in order to check if the joists will support the maximum load. It is also needed to check if the plywood will support this load as well. This work will be added here next.

 